Please fill out the applicable boxes below & click the calculate button
Insert & Printing Costs
Polybridge Training has kindly provided this calculator for the exclusive use of PlastikCity users.
The calculator is provided “as is” and without any representation or warranty of any kind, including that it is fit for any purpose or of merchantable quality or functions as intended or at all. Your use of the calculator is entirely at your own risk, and neither PlastikCity nor Polybridge Training accepts liability of any kind.
Polybridge Training, a UK company, has a worldwide reputation for delivering injection moulding training and technical support. They provide scheduled and customer-specific training courses in the UK, Ireland, Europe and Asia. Scheduled courses take place in the UK, covering process-related product & mould design issues. Email Dave Jeavons at info@polybridgetraining.co.uk to discuss your training requirements.
Production duration (hours) | 0 |
---|---|
Gross hourly output (exc scrap allowance & machine efficiency) | 0 |
Net hourly output (parts) | 0 |
Cycles per hour | 0 |
Net daily output (parts) | 0 |
Total material throughput (kg/hr) | 0 |
Gross weekly output (parts) | 0 |
Net weekly output (parts) | 0 |
Net monthly output, based on 4 weeks (parts) | 0 |
Net production per shift (0 hour shift) | 0 |
Gross annual output (parts) | 0 |
Net annual output (with scrap allowance of 0%) | 0 |
Anuual gross material usage | 0 |
Annual virgin material usage | 0 |
Annual regrind material usage (Addition 0%) | 0 |
Overhead costs per part (pence) | 0 |
---|---|
Tool cost per part (pence) | 0 |
Machine cost per part (pence) | 0 |
Material cost per part (pence) | 0 |
Masterbatch cost per part (pence) | 0 |
Regrind cost per part (pence) | 0 |
Inserts & printing cost (pence) | 0 |
Total Net cost per part (pence) | 0 |
Net cost per thousand (£) | 0 |
Annual virgin material cost | 0 |
Annual regrind material cost | 0 |
Component cost (pence) | 0 |
---|---|
Profit per week (£) | 0 |
Profit per 1000 parts (£) | 0 |
Earnings per part (£) | 0 |
Batch profit over production run (£) | 0 |
Profit percentage | 0 |
Selling price per thousand to achieve profit margin (£) | 0 |
Polybridge Training has kindly provided this calculator for the exclusive use of PlastikCity users.
The calculator is provided “as is” and without any representation or warranty of any kind, including that it is fit for any purpose or of merchantable quality or functions as intended or at all. Your use of the calculator is entirely at your own risk, and neither PlastikCity nor Polybridge Training accepts liability of any kind.
Polybridge Training, a UK company, has a worldwide reputation for delivering injection moulding training and technical support. They provide scheduled and customer-specific training courses in the UK, Ireland, Europe and Asia. Scheduled courses take place in the UK, covering process-related product & mould design issues. Email Dave Jeavons at info@polybridgetraining.co.uk to discuss your training requirements.